What are the trial steps for injection molds?

Optimize mold design and process parameters, avoid unnecessary errors, achieve a multiplier effect, and meet the high-quality requirements of mass production. In this way, even if the materials, machine settings or environmental factors change, a stable and uninterrupted mass production environment can still be ensured. Most of the defects of molded products are caused during the plasticization and injection molding stages, but improper mold design and poor mold structure are the root causes! Trial mold influence factors: mold cavity number, cold/hot runner system design, injection inlet Type, location and size, as well as the structure of the product itself. Therefore, in order to avoid product defects caused by mold design, we need to analyze the mold design and process parameters when making the mold. It needs to be emphasized that the purpose and focus of mold trial is to optimize the mold and process to meet the requirements of mass production, not just to test out good product samples.

The first step: mold dry run test
1. Inspection of mold opening and closing under low pressure
2. Inspection of mold ejection system (under low pressure)
3. Inspection of mold reset
4. Check the movement of the row position (slider), mold dry run test

Step 2: Test the balance of the injection molding cavity
1. Continuously hit 5 molds in turn, and weigh their weight
2. Record the weight of each product in each mold
3. Reduce the injection volume and fill up 3 molds each with 20%, 50%, and 90% samples in sequence
4. Weigh and record the weight of each of the above products
5. If the difference between the maximum weight and the minimum weight of the product is less than 2% of the weight, it is acceptable-if the weight fluctuation error is within 2%, it indicates that the cavity is balanced, otherwise the injection is not balanced
6. If it is a single-cavity mold, it is also necessary to test the balance of the injection of glue (observe the actual situation of the glue).

The third step: the test of the holding time (gate freezing) time
1. When the pressure holding time is set to 1 second, 3 molds are formed each time
2. As shown in the table, increase the pressure holding time and reduce the cooling time in order to make the whole cycle unchanged (until the gate is frozen and sealed and the product weight does not increase) Ⅲ. Set multiple different as shown in the figure below Holding pressure time, each time forming 3 mold products, weigh the product weight in the specified cavity, and record the data in the table in turn. Ⅳ. Determine the better holding pressure time according to the chart.

The fourth step: the determination of a better clamping force
1. When the holding pressure switch position/holding pressure is set to the best, the clamping force is set to within 90% of the maximum clamping force, 3 molds are formed, and the weight of each mold product is recorded
2. The clamping force is reduced by 5Ton in turn, 3 molds are formed each time, and the product weight of each mold is recorded until the weight of the product suddenly becomes larger, and the weight increases by about 5% when flashing around the product begins to determine the better clamping force.

The fifth step: the determination of a better cooling time
1. When the injection molding process conditions are appropriate (after the product is full), estimate the cooling time (primarily choose a longer cooling time to completely cool the product), shoot 3 molds, and measure its size
2. Record the product size in the table and observe the deformation of the rubber parts. Ⅲ. Reduce the cooling time of the product by 1 second, and hit 3 molds. Ⅳ. Reduce the cooling time until the product begins to deform and the size begins to decrease. Ⅴ. Each cooling time The size of the injection molded product should be measured after the plastic part is fully cooled (about 15 minutes). Ⅵ. The basis for determining a better cooling time-the determination of a better cooling time considering the dimensional stability of the product

Step 6: Test the flow of cooling water
1. When the injection molding process conditions are appropriate (after the product is full), estimate the cooling time (primarily choose a longer cooling time to completely cool the product), shoot 3 molds, and measure its dimensions. Ⅱ. Record in the table below Product size, observe the deformation of the plastic parts
2. The product cooling time is reduced by 1 second, and 3 molds are used. Ⅳ. Reduce the cooling time until the product begins to deform and the size begins to decrease. Ⅴ. The product injected during each cooling time should be fully cooled after the plastic part is fully cooled ( It takes about 15 minutes) to measure its size. Ⅵ. The basis for determining a better cooling time-a test that considers the dimensional stability of the product and the flow of cooling water

Step 7: Test the uniformity of mold cooling
1. Use a mold temperature measuring instrument to measure the temperature of 10 points in each of the core and cavity, and record them in the table below
2. The difference between the actual temperature at each measurement point and the average value should be less than 2°C. If the difference from the average value exceeds 2°C, it indicates that the mold cooling effect is uneven, and the cooling system mold cooling uniformity test should be improved.

Step 8: Determine the best injection speed
1. Record hydraulic oil temperature, melt temperature and mold temperature
2. Set the end position of the sol first, and only use the first level of glue
3. Set the holding pressure and holding time to zero, and after determining the starting position of injection, gradually increase the injection speed
4. Adjust the injection speed and fill to 95% of the rubber part (observe whether there is any padding, leave a 5-10mm padding amount)
5. Record the highest injection speed reached when filling to 95% of the rubber part
6. Record the highest injection speed and peak pressure of injection in the "Injection Speed ??Analysis Data Sheet"
7. Gradually reduce the injection speed, increase the injection pressure, observe and record the peak injection pressure when the rubber is filled to 95% of the position
m.3g265.com

主站蜘蛛池模板: 女女互磨互喷水高潮les呻吟| 国产suv精二区| 成人午夜高潮刺激免费视频| 樱花草在线社区www日本影院| 国产在线观看无码不卡| 精品无码av一区二区三区不卡| 337p大胆啪啪私拍人体| 香港三级日本三级a视频| 日本黄网站三级三级三级| 国产亚洲熟妇在线视频| 亚洲 日韩 国产欧美 另类| 国产精品一卡二卡三卡四卡| 久久久www免费人成精品| 久久九九久精品国产日韩经典| 国产在线不卡视频免费视频| 亚色九九九全国免费视频| 亚洲精品中国国产嫩草影院美女| 波多野结衣av无码久久一区 | 永久免费无码网站在线观看| 伊人久久大香线蕉av一区| av中文无码乱人伦在线观看 | 国产白丝精品爽爽久久久久久蜜臀| 午夜福利精品导航凹凸| 亚洲日韩成人av无码网站| 阳茎伸入女人阳道视频| 午夜亚洲国产理论片中文飘花| 亚洲va成无码人在线观看天堂| 曰韩人妻无码一区二区三区综合部| 少妇又爽又刺激视频| 国内精品久久久久影院老司机| 中国熟女仑乱hd| 中文字幕亚洲无线码在线一区| 成人伊人亚洲人综合网站| 亚洲—本道 在线无码av发| 综合亚洲桃色第一影院| 播放男人添女人下边视频| 亚洲色自偷自拍另类小说| 亚洲精品国产美女久久久99| 手机国产乱子伦精品视频| h肉动漫无码无修6080动漫网| 99精品视频在线观看婷婷|